Technician payroll in Malaysia comes down to four numbers you must get right every month: what the person earned (per job or monthly), what is cut for lateness or unpaid leave, what EPF, SOCSO and EIS are worked out on, and what someone who joined or left mid-month is owed. Get one wrong and the bank transfer cannot be taken back.
This is how the salary of the repair team behind our 100+ Johor Bahru homestay units is worked out inside our Handyman system, step by step, and the parts we still do by hand. It is not legal or tax advice; for your own company, check with your payroll agent, KWSP and PERKESO.
If you want the rest of a technician's day first, read how our repair team runs a full day on WhatsApp and how petrol claims work.
Why is technician payroll harder than office payroll?
An office worker gets the same salary every month. A repair team does not:
- Some are paid per job. A part-timer or a new technician may earn a rate for each completed job, so pay changes every month.
- Lateness is real money. A technician who arrives at 10:30 instead of 9:00 delays three jobs, and most bosses want that reflected.
- People come and go mid-month. Field teams turn over faster than office teams. Someone who starts on the 11th, or leaves on the 20th, must be paid for exactly those days.
- The boss pays in batches. Three people want their money on the 28th, the rest on the 5th. A spreadsheet that locks the whole month after the first transfer forces you to start over.
Google's first page for this topic is general payroll guides from HR software companies. They explain EPF rates well, but none of them deal with a team where half the people are paid per job and the boss pays them one by one. So this article is about that.
How do we work out what a technician earned this month?
Each person has one pay type in their profile:
| Pay type | How the month's base is worked out | Notes |
|---|---|---|
| Monthly | The agreed monthly salary | Cut by days if they joined or left mid-month |
| Per job | Completed jobs that month × the per-job rate | Only jobs marked done, assigned to that person, completed in that calendar month |
| Daily / hourly | Treated as the agreed total for the month, like monthly | A real day-by-day or hour-by-hour calculation is not built yet |
On top of the base, the boss can add allowances (fixed every month, or added for one month only), overtime, and other deductions. Every line sits on the payslip with its name, so the technician can see why the number is what it is.
Example (not a real salary): a per-job technician with a rate of RM40 who finished 50 jobs in November has a base of RM2,000 for November. If they finished 30, the base is RM1,200, and that is where the next section matters.
Does a per-job technician still get the minimum wage?
Yes. Malaysia's minimum wage is RM1,700 a month under the Minimum Wages Order 2024, enforced for every employer from 1 August 2025 (Malay Mail, Skrine). Legal summaries say people paid only by piece rate, task, trip or commission must still receive at least RM1,700 a month. A new rate was being decided around Budget 2027 at the time of writing, and reports differ on the figure and start date, so check the official notice before you set rates.
What our system does not do: it does not check the per-job total against the minimum wage. In the example above, 30 jobs × RM40 = RM1,200, and the system would calculate RM1,200 without a warning. The boss has to top it up as an allowance. If you pay per job, set the rate and the number of jobs you can actually give each person so this does not happen every slow month.
How is lateness and unpaid leave taken off?
The company sets its own denominators once. The defaults are 26 working days a month and 8 hours a day, which gives a daily and an hourly rate from the monthly base. Then the boss chooses one of three lateness rules:
| Lateness rule | What is taken off |
|---|---|
| By the hour (default) | Minutes late × the hourly rate |
| Fixed amount | A set amount each time the person is late |
| Half day | Half a day's pay when late by more than a set number of minutes (default 60) |
Unpaid leave is taken off by the day using the same daily rate. Allowances can also be made conditional: with the attendance rule, an allowance drops to zero if the person took unpaid leave that month, and to half if they were late at all.
What is still manual: the late minutes and unpaid-leave days are typed in by the boss. The clock-in records in the system are not turned into late minutes automatically yet. When the boss presses Recalculate, the typed numbers are kept, not reset to zero.
What do EPF, SOCSO and EIS get calculated on?
EPF, SOCSO and EIS are calculated with the official contribution tables, not a flat percentage. EPF uses the KWSP Third Schedule (employee 11%, employer 13% up to RM5,000 and 12% above, wage taken to its RM20 band). SOCSO and EIS use PERKESO's RM100 wage bands, with the RM6,000 ceiling. We checked these against real KWSP and PERKESO payslips, and the same calculation is used across all our products, so one person never gets two different EPF numbers in two systems.
The order matters. The contributions are worked out on the gross wage before lateness and unpaid-leave cuts, not on the take-home amount. The employer's share is shown separately and is not taken from the salary.
LINDUNG 24 Jam (SKBBK), PERKESO's non-work injury scheme from 1 June 2026, is only deducted when the boss ticks it for that person. PCB (monthly tax deduction) is not calculated by our system: the boss types the PCB figure from LHDN's calculator, and it is taken from the net salary.
A point we have to tell you honestly: in our system, overtime is added to gross pay, so EPF is currently calculated on it too. Most Malaysian payroll guides that quote KWSP's list say overtime is not a wage for EPF purposes (Kakitangan, Talenox). That means a team with a lot of overtime may pay more EPF than required. Paying more is not usually a legal problem, but it is money. Until we change it, a company that pays a lot of overtime should check with KWSP or its payroll agent.
How do you pay someone who joined or left mid-month?
The monthly base is cut by calendar days, not working days: monthly salary ÷ days in that month × days the person was employed. The Employment Act formula for an incomplete month uses the days in the wage period, and HR guides that discuss it describe these as calendar days, weekends included (BrioHR).
Example (not a real salary): a technician on RM2,000 a month starts on 11 November. November has 30 days and they were employed for 20, so the base is RM2,000 ÷ 30 × 20 = RM1,333.33. Per-job pay, overtime and allowances the boss typed are not cut again, because they already reflect what the person did.
Two staff statuses are kept apart on purpose:
- Resigned: they worked, then left. They appear on the payroll of the month they left, paid up to their last day, and disappear after that.
- Inactive: they should never be on payroll (an account made by mistake, someone who never turned up). They appear in no month.
We split these after a real problem: someone who left on the 20th was marked inactive and disappeared from that month's payroll, together with the 20 days they were owed.
How do we pay people in batches without breaking the month?
Each month has one payroll run with one line per person, and money goes out in three steps:
- Set up payment: the boss chooses how much to release now for each person, all of it or part of it.
- Pending payment: the finance person makes the bank transfers. Bank transfer, cash and cheque are recorded.
- Completed: everything owed for that month has been paid.
The lock is on the person, not the month. Once someone has received money, their numbers cannot be changed or recalculated, because the bank transfer cannot be taken back. Everyone else in the same month can still be edited. An earlier version locked the whole month: when 3 of 10 people were paid early, the other 7 could not be corrected, and the boss went back to Excel.
When the boss marks someone who has been paid as resigned later, their line stays. The money really went out, so the record must stay too.
What does the accountant get?
- An EPF and SOCSO page with each contribution on its own line (EPF, SOCSO, EIS, SKBBK, PCB), split into the employee's part and the employer's part, because they are reported separately.
- CSV exports for EPF and for SOCSO/EIS for the month, with name, IC number, wage and each share.
- Accounting entries in Bukku: salary and contributions are posted as journals. If a person's numbers change while they are still pending, the journal is edited in place, not duplicated.
- Payslips for technicians: a technician can see their own payslip once the month is finalised or once they have received money, so someone paid half early sees the right balance.
Contributions for a month are generally due by the 15th of the next month (MiHCM). The system shows the amounts but does not submit anything to KWSP or PERKESO for you.
Where is our system still weak?
We would rather tell you now than after you sign up:
| Weak spot | What it means for you |
|---|---|
| No minimum-wage check on per-job pay | A slow month can produce a salary below RM1,700 without a warning |
| Overtime included in EPF wages | You may pay more EPF than required |
| PCB typed by hand | You still need LHDN's calculator or your agent |
| Late minutes and unpaid leave typed by hand | Clock-in data is not converted automatically yet |
| Daily and hourly pay treated as a monthly total | Real day-rate or hour-rate payroll is not built |
| Standard case only: Malaysian or PR under 60 | Workers over 60 and foreign workers (EPF compulsory for them from October 2025) need different rates, which you must handle with your agent |
| Accounting posts to Bukku only | Other accounting software needs manual entries |
| Per-job counts every done job the same | A 10-minute bulb change and a 4-hour pipe job pay the same rate |
Do you need any of this?
If you have one or two technicians on a fixed monthly salary, you probably do not. KWSP's and PERKESO's own tables and a simple spreadsheet will do, and a payroll agent is cheaper than changing how you work.
It starts to matter when you have per-job and monthly people in the same team, people joining and leaving often, and a boss who pays in batches. That is the situation our own repair team is in, and it is why the payroll sits in the same system as the jobs: per-job pay is counted from the jobs that were actually marked done, not from a list someone sends at month end.
To see how the repair jobs themselves are run, read how we dispatch repairs across 100+ homestay units and who approves repairs and how the bill reaches the owner. If you want our team to handle repairs for your units, or want to ask about the Handyman system, see Handyman.